Description
Daman’s proposed Signature Bridge is set to connect Jampore Sea Front Road near the Lighthouse with Devka Sea Front Road at Parkota Sheri. The ₹307.71 crore project has been awarded to Ashoka Buildcon by Daman PWD, with a 30-month construction period.
The project has been in planning since 2022, when PWD initiated consultancy work for its DPR, surveys, drawings and estimates.
[Daman Signature Bridge, Jampore Sea Front, Devka Sea Front, Daman Infrastructure, Daman Development]
SUBMIT YOUR BAND
Want airplay on Metal Devastation Radio, PR support through MDPR, or a shot at Tennessee Metal Devastation Music Fest?
Send your band name, location, and links (music + socials) to: zach@metaldevastationradio.com
We check every submission for radio rotation, PR campaigns, and live festival opportunities. If it fits, we’ll be in touch.

